Leeds Bradford Airport, Office Fit Out & Refurbishment

Office & Commercial Leeds 13 weeks £650k
Office & Commercial Leeds 13 weeks £650k

Project
description

The office refit was the refurbishment of a second-floor office housing the Leeds Bradford Airport staff. Lodestone’s brief was to take the old and tired looking offices and bring them back to life to encourage staff members to come into the office more regularly after a large stint of working from home. Lodestone along with Fuse Design Studios (architects) facilitated multiple design team meetings to begin to build the scope and fully understand the project brief. From there we were able to come up with suitable designs ranging from Bronze, Silver and then Gold in terms of spec and budget.

The project was stripped back from its current CAT B state with walls removed and then rebuilt creating a more open plan working environment with meeting rooms located around the perimeter. The offices received high quality finishes to the toilets, kitchens, office, and meeting room spaces.

Project
challenges

The biggest challenge we faced was the logistics of working in an airport while the airport remained live 24/7. This meant a lot of careful planning to ensure the site could ensure continuity through timely delivery of materials to align with the requirements of the airport’s security department. Each vehicle had to be stopped and inspected by security when entering the premises whilst also arriving at prebooked time slots.

In addition to this, the requirement for new M&E services meant having to carry out a crane lift to install the new external condenser on the external plant deck. Co-ordinating the crane lift presented a lot of challenges due to the nature of the activity within the grounds of an airport where overhead risks are always very present. Through a lot of careful planning between ourselves, the crane company and the airports health & safety department we successfully completed the crane lift without any disruptions.

Project
highlights

  • High Security Project Environment
  • Design & Build
  • Fast Track Programme
  • Multiple Stakeholders

Project
outcome

The project was delivered on time in 13 weeks snag free. The works were finished to a very high standard with no disruption to the airport’s activities.

The Result

Fancy world-class delivery with a personal touch?

Get in Touch
1200px Knight Frank Logo white
2560px Grainger logo white
Aagrah white
AHR company logo white
Avery Dennison Logo white
Bettys and Taylors of Harrogate Logo white
Bradford Council grayscale
Computershare logo white
EnjoyDesign logo white
faithful and gould vector logo white
FET Master Logo March 2018 white
Gardiner & Theobald white
Grainger Logo with Strap white
GSS Architechture white
Heron Foods Logo Grayscale
KP white
KPP white
LBA white
TEN white
Leeds Beckett Uni white
Leeds trinity Grayscale
lloyds banking group1426 white
LNER Logo 2019 white
MEPC white
Notre Dame Logo RGB SQUARE 8bf5k 300x300 Grayscale
RBS white
RLB Logo 2017 Grayscale
Rudding Park white
skipton building society logo white
teeside uni logo for article white
Trident white
shipley college logo 2022 white
University of Huddersfield logo white
Turner Townsend tt logo white
University of York logo @2x white
Virgin Media white
Visual identity section images e1618925864440 white
HNC Grayscale
woodhouse logo Grayscale
Fuse Grayscale
Sheffield Uni

We would love to hear from you.

Address

Leigh House, Varley Street,
Leeds, LS28 6AN

We would love to hear from you.

Leigh House, Varley Street,
Leeds, LS28 6AN